product
Crushing Equipment
Jaw crusher Impact Crusher Fine impact crusher Hammer crusher Stone Production Line Sand-making Line Sand production line Vibrating feeder Belt Conveyer Sand Making Machine(Vertical shaft impact crusher) V-series fine crusher Vertical combination crusher Sand washing machine Roller crusher Ring hammer crusher Heavy Hammer Crusher Cone crusher Mobile crushing plant
Mine-selecting Equipment
Building Material Equipment
Cement Equipment
Contact us
- company name:Zhengzhou Yufeng Heavy Machinery Co.,Ltd
- factory add: North Dongfang Road, Mazhai Industrial Park, Zhengzhou City, Henan, China
- Tel: +86 371 60395600
- Fax: +86 371 67681159
- Cell: +86 15890080350
- Email: yumachine@gmail.com
- MSN:yumachine@hotmail.com
- Skype: yumachine
Position:home>>News>>in detailNews
Initial Considerations kiln firing
Article source:
Before kiln firing after all preparatory work properly, check the kiln does nobody, and with the auxiliary contact a good job, you can be ignited. Start the ignition is
not required to open the exhaust fan, simply open the kiln gate, with natural ventilation, not through the ESP, without spare chimney can also be the ESP, but the
non-transmission, timber after stoke, once the wind and Trace into coal, then gradually increase, according to whether the pulverized coal ejected falls wood
woodpile then adjust the flame temperature zone one, two, second wind. When most of burning wood finish, firebrick shiny surface, the first rotary kiln 1/6 turn, but
also full turn, but can not be transferred, to prevent the fire is out. After the kiln temperature gradually increased every 3-5 minutes once the rotary kiln, rotary kiln
every 1/4 turn until the firing zone firebrick surface heat evenly, gradually increasing a secondary air, coal spray into the kiln flame has formed, you can open the
exhaust fan, exhaust fan opening prior to gate off a small kiln, exhaust fan out later, and then adjust according to the length of the flame kiln gates. After opening
the exhaust fan, kiln temperature gradually increased, when the dry kiln reaches about 500 ° C, wet kiln reaches 120-160 ° C, the continuous operation of the kiln
can be slow, and began feeding, the initial volume of feed as normal 50-70% of the volume of feed, feeding machine should be synchronized with the kiln speed,
the fastest first class kiln speed is 50-70% of normal kiln speed, the material yet to come before the firing zone, the basic method of operation is leaving the fire,
heat to be expected at this time pay attention to controlling the burning zone temperature should not be too high to prevent damage to the bricks, but do not fire,
keeping kiln is dark red, until the raw material coming firing zone, the only appropriate increase in firing into temperature. The above article by Henan YuFeng
Heavy Machinery finishing release, reproduced, please indicate the source!