product
Crushing Equipment
Jaw crusher Impact Crusher Fine impact crusher Hammer crusher Stone Production Line Sand-making Line Sand production line Vibrating feeder Belt Conveyer Sand Making Machine(Vertical shaft impact crusher) V-series fine crusher Vertical combination crusher Sand washing machine Roller crusher Ring hammer crusher Heavy Hammer Crusher Cone crusher Mobile crushing plant
Mine-selecting Equipment
Building Material Equipment
Cement Equipment
Contact us
- company name:Zhengzhou Yufeng Heavy Machinery Co.,Ltd
- factory add: North Dongfang Road, Mazhai Industrial Park, Zhengzhou City, Henan, China
- Tel: +86 371 60395600
- Fax: +86 371 67681159
- Cell: +86 15890080350
- Email: yumachine@gmail.com
- MSN:yumachine@hotmail.com
- Skype: yumachine
Position:home>>News>>in detailNews
Kiln firing Notice : Before drying kiln system checks and preparation
Article source:
1 , remove the kiln , preheater, calciner and tertiary air duct inside the debris ( such as bricks , wire and other items left over
from the installation ) . 2 , the valves compressed air piping system flexible rotation , the switch position is correct, smooth
lines , do not leak. Each blow plugging holes open. 3, check the refractory masonry case : key parts of the next feeding tube
, cone , sprinkle the board under parts of the masonry material surface smooth. Accumulation of debris on the volute
cyclone to dissection. Each entry Manhole no distortion , lining firmly. After checking all of Confucian closed and sealed. 4 ,
confirm that the system temperature and pressure measuring point hole correctly , an instrument measuring point to smooth
lines , a good seal . In particular, to ensure that the negative Rotary Dryer hood , kiln smoke chamber temperature and pressure ,
calciner , C5 exports and export C1 accurate temperature and pressure instrumentation . 5, confirm the preheating system to
cyclone flashing flexible flap valve , sealing well, the hammer raised to the appropriate location . After the inspection, the
next feeding tube preheater system for all flap valve lift with wire , is fully open state , so that when dried by hot gases . 6 ,
when starting calciner feed coal Roots blower ( or disconnect the calciner feed coal pipeline ) to prevent drying wet gas
intrusion . 7 , confirm system cyclone preheater , calciner and the top of the top of the rising levels of castable vent pipe
should not sealed . 8 , kiln, kiln coal injection system after the pipeline should ensure smooth linkage test , adjust flexible ,
ready to be put into operation , the oil ignition system has been tested spray . 9 , confirm the tank , the pump is ready ,
ready to light diesel oil 25 ~ 30t. 10 , confirmed clear blocking tools, safety supplies get ready . 11 , for the first time when
the smoke chamber temperature to 900 ℃ , the kiln ash was molten material when the ignition is acidic , alkaline refractory
bricks have corroded sex . At the end of the heating process ignition temperature rose 600 ℃, 700 ℃, 800 ℃ , respectively,
pre- cast 20 ~ 30t raw material . 12 , grate cooler inspection and preparation ( 1 ) point by point examination grate plate
fastening . ( 2 ) Crusher checks. ( 3 ) In some grate cooler Shop 200 ~ 250mm thick bed of clinker to prevent heat radiation
during the drying kiln . 13 , point by point examination trough conveyor fasteners and lubrication points , to ensure that the
kiln feed after a certain running time . 14 , clinker feed library to be cleared before construction debris left over from the
installation , to prevent clogging of the material . 15 , raw material feed chute to strictly check for leaks , breathable layer is
broken . 16 , kiln, kiln dust collector in strict accordance with the " dust collector manual " one by one to check and make
sure you can use . 17 , check the humidifier tower sprinklers , sprinklers are to be drawn for each check . 18 , Kiln coal
burner in accordance with the requirements for positioning. 19 , raw material library memory raw feeding amount not less
than 8000t . ( If the raw material produced during the trial production of the raw material quality indicators and
requirements differ too much , do not keep too much material in the raw material inventory ) . Specializing in the production
of rotary kiln in Henan YuFeng Heavy Equipment : The main products are : lime kiln , rotary kiln , ceramic sand | sand rotary
kiln , rotary kiln calcium aluminate powder , laterite nickel ore rotary kiln, rotary kiln magnesium , zinc oxide rotary kiln ,
bauxite rotary kiln, rotary kiln oil proppant , disc granulator, wind swept coal mill , ball mill, preheater , burners, coolers , etc.
Welcome new and old customers to our company to negotiate! Reproduced please specify Henan YuFeng Heavy Machinery